PSM : Process Safety Management System
Process safety data, process risk analysis, safe operation plan and emergency action plan etc. based on Article 49-2 of the Industrial Safety and Health Law for business sites holding harmful hazard facilities where the risk of serious industrial accident occurrence is large It is a system to prevent serious industrial accidents by creating a report of the review, review and confirmation.
Industry | Industry Classification Code |
---|---|
The crude oil refining industry | 19210 |
Other petroleum refined water reprocessing industry | 19229 |
Production of petrochemical basic chemical substances | 20111 |
Manufacture of synthetic resins and other plastic materials | 20202 |
Nitrogen compounds, nitrogen, phosphoric acid, and potassium fertilizer manufacturing industry | 20311 |
Chemical fertilizer manufacturing industry such as compound fertilizer | 20312 |
Manufacture of chemical and bactericidal insecticides and agricultural agents | 20321 |
Chemical and fireworks products manufacturing industry | 20494 |
※The specified quantities of flammable gas and flammable liquid are 5,000 kg for production and handling, 200,000 kg for storage
Hazardous / Dangerous Substance Name | Specified Quantity |
---|---|
Flammable gas | 5,000 |
Flammable liquid | 5,000 |
Methyl isocyanate | 150 |
phosgene | 750 |
Acrylonitrile | 20,000 |
ammonia | 200,000 |
chlorine | 20,000 |
Sulfur dioxide | 250,000 |
Sulfur trioxide | 75,000 |
Carbon disulfide | 5,000 |
Hydrogen cyanide | 1,000 |
Hydrogen fluoride (anhydrous hydrofluoric acid) | 1,000 |
Hydrogen chloride (anhydrous hydrochloric acid) | 1,000 |
Hydrogen sulfide | 1,000 |
Ammonium nitrate | 500,000 |
Nitroglycerin | 10,000 |
Trinitrotlyse yen | 50,000 |
hydrogen | 50,000 |
Ethylene oxide | 10,000 |
Phosphine | 50 |
Silane | 50 |
Nitric acid (weight 94.5% or more) | 250 |
Fuming sulfuric acid (sulfur trioxide weight 65% or more and less than 80%) | 500,000 |
Hydrogen peroxide (weight 52% or more) | 35,000 |
Toluene diisocyanate | 100,000 |
Chlorosulfonic acid | 500,000 |
Hydrogen bromide | 2,500 |
Phosphorus trichloride | 750,000 |
Benzyl chloride | 750,000 |
Chlorine dioxide | 500 |
Thionyl chloride | 150 |
bromine | 100,000 |
Carbon monoxide | 1,000 |
Bonso Tree Chloride | 1,500 |
Methyl ethyl ketone peroxide | 2,500 |
Boron trifluoride | 150 |
Nitroaniline | 2,500 |
Chlorine tree puruorufa | 500 |
Fluorine | 20,000 |
Cyanuric fluoride | 50 |
Nitrogen tree pull up freight | 2,500 |
Nitrocellol male (flow rate to nitrogen 12.6% or more) | 100,000 |
Benzoyl peroxide | 3,500 |
Benzoyl peroxide | 3,500 |
Dichlorosilane | 1,500 |
Diethyl aluminum chloride | 2,500 |
Diisopropyl oxidated carbonic acid | 3,500 |
Hydrofluoric acid (1% or more by weight) | 1,000 |
Hydrochloric acid (10% or more by weight) | 20,000 |
Sulfuric acid (10% or more by weight) | 20,000 |
Ammonia water (10% or more by weight) | 20,000 |
[Relationship of 3 in Enforcement Regulations Article 130]
Report content | basic data |
---|---|
Business outline | Business registration card / present condition of establishment |
Process safety data | |
Physical properties and usage of chemical substances | Handling and storage Use and storage amount of each chemical substance |
Material Safety Data Sheet | MSDS of chemical substances |
Material Safety Data Sheet | MSDS of chemical substances |
List of power machines | Power Machine Design Data Sheet (Specs) |
Equipment and equipment specifications | Device-specific design specification strength statement, ASS'Y. DWG |
Piping and gasket specification | Piping and gasket specification |
Safety valve and safety valve specified | PSV, BRV Design Data Sheet |
Process manual | Process overview, process variables |
PFD, P & ID and UFD | Drawing |
Overall layout | Drawing (the plan of the whole process) |
Building layout and hardware layout | Partial view (LAY-OUT drawing) |
Building and iron structure drawing (plan each floor plan) | Floor plan and elevation of each floor |
Fireproof structure specification | Fireproof material test report |
Fire extinguisher installation plan and layout | Firefighting equipment specifications, capacity statement, and layout |
Fire detection and alarm installation plan | Drawing |
Gas leak detection and alarm equipment layout | Installation plan (current status and drawings) |
Grounding specifications and grounding drawings | Grounding specifications, grounding statements and grounding arrangements |
Installation plan of face wash and cleaning facilities | Installation plan (current status and layout) |
Overview of the local exhaust system | Design criteria for the local exhaust system |
Ventilation and Forced-Ventilation Overview | Overall ventilation and forced ventilation design criteria |
Explosion-proof area division | Drawing |
Explosion-proof electrical / instrument equipment specification and selection criteria | Design specification |
Also electrical disconnection | Drawing and statement of short circuit capacity |
Use the emergency power supply related drawings and the emergency power supply Load List | Emergency power supply design criteria |
Safety design, production and installation related guidelines | Design, manufacture, and installation related codes and standards |
Waste treatment design criteria and specifications | Basic data of design |
Evaluation of process hazards | |
Qualitative evaluation | The basic document of hazard evaluation such as P & ID |
Accident frequency minimization and damage minimization measures | Examination of related parties |
Quantitative evaluation | Basic data of evaluation |
Risk analysis Attendant | Cooperation of specialized evaluators |
Safe driving plan | |
Safe driving instruction | Creation map-Operation MANUAL (Operation procedure manual including trial operation, S / U & S / D, normal operation, emergency operation, etc.) |
Guideline for equipment inspection, inspection, maintenance, and maintenance planning | Equipment priority classification |
Safety permit | Creation map |
The management plan of cooperating company | Creation map |
Education plan and training | Creation map |
The procedure of check before moving | Creation map |
Change element management plan | Creation map |
Self-audit plan | Creation map |
Accident investigation plan | Creation map |
Emergency action plan | |
Creation map |