Prior to installing, relocating or changing any construction, machinery, equipment and equipment directly related to the production process, prepare and submit a hazard risk prevention plan, and review safety in advance, ensuring source safety It is a statutory system to contribute to the maintenance and promotion of occupational injury prevention and worker health and safety.
Systems and Related Laws
Based on the Industrial Safety and Health Act Article 48, paragraphs 1 and 2, the employer of the business corresponding to the type of industry and scale determined by the Labor Ministry Ordinance, etc. When establishing, relocating, or changing its main structural parts, hazardous protection plan shall be prepared and submitted to the Secretary of Labor as required by the Labor Ordinance.
Industrial Safety and Health Law Enforcement Order Article 33-2
Industrial Safety and Health Law Enforcement Regulations Article 120-Article 124-2
If you do not create and submit a hazard risk prevention plan in violation of the provisions of Article 48 (1) to (3) of the Act, a fine of 10 million won will be imposed
Business Place Targeted for Submission
Target industry
Manufacture of metalworking products (except machinery and furniture)
Non-metallic mineral products manufacturing industry
Other machinery and equipment manufacturing industry
Car and trailer manufacturing
Food manufacturing industry
Rubber products and plastic products manufacturing industry
Wood and wood products manufacturing industry
Manufacture of other products
Primary metal manufacturing industry
Furniture manufacturing industry
Chemical substance and chemical product manufacturing industry
Semiconductor manufacturing
Electronic parts manufacturing industry
Increase in changed facilities and incidental facilities, etc. due to expansion of facilities and replacement or remodeling before establishment of a business establishment with a total of 300 kW or more of electricity contract capacity
Target equipment
In the case of manufacturing establishments, when installing or relocating the following facilities or changing major structural parts:
Melting furnace (metal or nonmetal mineral)
When installing or relocating a melting furnace with a capacity of 3 tons or more
If you increase the melting capacity of the existing melting furnace, change the type of heat source or the internal structure,
Chemical equipment
When setting up or transferring special chemical equipment that handles more than the standard amount
When replacing, changing or adding target special chemical equipment to increase production of existing special chemical equipment
※What is special chemical equipment?
⁻ A reaction apparatus (reactor) in which an exothermic reaction occurs
⁻ Devices that perform separation such as high-grade, rectification, evaporation, extraction etc. where the inside of the device is operated within the danger concentration of explosion
⁻ Equipment operated with the temperature of the substance to be heated being higher than the decomposition temperature or the ignition point of the dangerous substance being heated
⁻ Equipment that may generate dangerous substances due to abnormal chemical reaction such as reaction runaway.
⁻ Equipment operated at high temperature (350 ° C) or high pressure (980 KPa) or higher
⁻ For heating of chemical substances (burner)
Drying equipment
The following drying equipment with a maximum heat consumption of 50 kg or more per hour, or a maximum power consumption of 50 kW or more based on a heat source
Gas collective welding equipment
Fixed gas collective welding equipment with fixed flammable gas concentration of 1,000 kg or more
Hazardous substance and dust work related equipment for permission and management
Newly or relocated a local exhaust system with a capacity of 60 m3 / min or more for related equipment that handles 49 types of substances subject to permission or management (targets for safety inspection), or add hoods, ducts, air purification sheets, and blowers; When changing
Handle substances other than 49 of the substances to be managed, or build or relocate a local exhaust device of 150 m3 / min or more at the dust dust working place, or add, change or change hoods, ducts, air purifiers, blowers If
Consulting Procedure
Examination and Confirmation Procedure
Submission Time
Until 15 days before the construction start
※Clause 4 of Labor Department notification 2008-82 Article 2 (definition)
⁻ "Construction start work" and the submission site of the plan document This means the start of construction work to install or relocate constructions, machines, equipment, facilities, etc. or change the structure.
Consulting Effect
Producing instruction based on quick knowledge and information
Fine and quick creation through specialized skills and human resources
Reduce inappropriate factors in the examination
Maximize the work efficiency of the person in charge by outsourcing and shorten the time
Ensuring safety by identifying risks in advance in the workplace